Geotechnical survey — Second Industrial City branch site

InternalApprovedV1

Geotechnical survey of the Second Industrial City branch & manufacturers’ centre site: soil strata, groundwater level and ground-improvement recommendations before the foundations.

More

Internal

Kingdom of Saudi Arabia

Riyadh Chamber of Commerce & Industry

Project Management Office (PMO)

Code
DOC-0212
Version
V1
Date
2026-09-24

Geotechnical survey — Second Industrial City branch site

Chamber Branch & Manufacturers’ Service Centre — Second Industrial City

⁦1⁩. Executive summary

This report gives the position of Chamber Branch & Manufacturers’ Service Centre — Second Industrial City to date: ⁦39% complete against 50% planned⁩, ⁦SPI 0⁩.⁦78⁩, ⁦CPI 0⁩.⁦89⁩, ⁦and an estimate at completion of SAR 16⁩.⁦07M⁩.

Project
Chamber Branch & Manufacturers’ Service Centre — Second Industrial City (⁦PRJ-2026-006⁩)
Project manager
Eng. Fahad T. Al-Sulami
Budget
⁦SAR 14⁩.⁦30M⁩
Progress
⁦39% actual against 50% planned⁩
Forecast finish
⁦2027-07-04⁩

⁦2⁩. Key findings

  • All planned milestones of the period met except one deferred
  • Actual spend rose in line with the work done
  • Three high risks under treatment, each with a named owner

⁦3⁩. Recommendations & decisions needed

  • Approve the proposed treatment of the high risks
  • Track the open findings with the vendor weekly

Prepared by

Eng. Fahad T. Al-Sulami
Issued from Munjaz — valid only once approved electronically1 / 1