Eng. Adel S. Al-Amoudi
Senior Site Engineer (Contractor) · Construction Projects & Buildings Department
Eng. Adel S. Al-Amoudi
Senior Site Engineer (Contractor)
- Mobile
- +966 58 274 6631
Engineering & construction delivery
Load now
Full
Free a week
0 h
48 h/week
This month’s cost
SAR 56.1K
At today’s allocation
Next peak
100%
In November 2026
- Planned as
- Field engineer
- Department
- Construction Projects & Buildings Department
- Hourly cost
- 270
- 48 h/week
- Work location
- Entrepreneurship centre site — Riyadh
- Joined
- 2025-07-06
Allocation across projects
July 2026 to June 2027 — planned bars are faded, leave is shaded
Monthly utilisation
Share of monthly capacity; the gold line is 100%
- Projects
- Outside projects
- Capacity
| Category | Projects | Outside projects | Total | Capacity |
|---|---|---|---|---|
| Jul | 100% | 0% | 100% | 100% |
| Aug | 100% | 0% | 100% | 100% |
| Sep | 100% | 0% | 100% | 100% |
| Oct | 100% | 0% | 100% | 100% |
| Nov | 100% | 0% | 100% | 100% |
| Dec | 100% | 0% | 100% | 100% |
| Jan | 100% | 0% | 100% | 100% |
| Feb | 100% | 0% | 100% | 100% |
| Mar | 100% | 0% | 100% | 100% |
| Apr | 100% | 0% | 100% | 100% |
| May | 100% | 0% | 100% | 100% |
| Jun | 61% | 0% | 61% | 100% |
Calendar & availability
Working days are Sunday to Thursday
Working days: 21 · days off: 0 · load 100%
Recorded leave
No leave recorded in this period
Skills & certifications
Levels 1 to 5, rated by the line manager
- Civil engineering4/5
- MEP engineering4/5
Professional certifications
- Professional engineerSaudi Council of Engineers · Issued 2015-07-01 · Expires 2027-07-01Valid
- OSHA 30OSHA · Issued 2024-01-14No expiry
Timesheet summary
The last eight weeks — billable and non-billable
Average week
48 h
48 h/week
Billable share
95%
Sent on time
7 of 7
- Billable
- Non-billable
| Category | Billable | Non-billable | Total |
|---|---|---|---|
| Week 37 | 46 h | 2 h | 48 h |
| Week 38 | 46 h | 4 h | 50 h |
| Week 39 | 45 h | 2 h | 47 h |
| Week 40 | 46 h | 3 h | 49 h |
| Week 41 | 44 h | 2 h | 46 h |
| Week 42 | 46 h | 3 h | 49 h |
| Week 43 | 46 h | 2 h | 48 h |
| Week 44 | 28 h | 1 h | 29 h |