Project proposal & feasibility study

An electronic form with an auto-filled header, an approval path and its versions, printed with its approval log.

Riyadh ChamberMunjazStrategy & projectsMunjazPMO PLATFORM

Proposal

Project proposal & feasibility study

Justification, objectives, benefits, cost and initial risks

Form no.
RC-PMO-F01
Template edition
2.1
Version
V1
Form date
⁦2026-06-18⁩
Hijri
3 Muharram 1448 AH
In approvalDMD-2026-008Energy-saving, carbon-neutral branches in the region’s governorates

Auto-filled — Filled by the platform from the project record, not typed.

Proposal no.
DMD-2026-008
Proposal
Energy-saving, carbon-neutral branches in the region’s governorates
Portfolio
Building Rehabilitation & Sustainability Portfolio
Sector
Support Services Sector
Sponsor
Eng. Bandar M. Al-Shammari
Proposed by
Eng. Mishari K. Al-Otaibi

1The proposalAuto-filled

TitleAuto-filled
Energy-saving, carbon-neutral branches in the region’s governorates
Proposed byAuto-filled
Eng. Mishari K. Al-Otaibi
DepartmentAuto-filled
Sustainability & Social Responsibility Department
Submitted onAuto-filled
⁦2026-06-18⁩
Proposal numberAuto-filled
DMD-2026-008

2Justification

The problem or need

The chamber’s branches and service points in the region’s governorates work from old buildings where energy costs SAR 11 per square metre a month and summer power cuts stop member service.

Today

1,600 MWh a year, diesel back-up generators running 60 days every summer, and 870 tonnes of emissions a year.

3Objectives

  1. Model branches in the governorates with an energy-efficient design, rooftop solar and storage that covers their whole demand.

Strategic objectives served

  • SO-3.1 — Produce more influential knowledge and information

4Expected benefits

KindBenefit
Cost savingEnergy cost down from SAR 11 to SAR 4.2 per m² a month
Sustainability870 tonnes of emissions avoided a year

5Cost & feasibilityAuto-filled

Estimated cost

SAR 3.2M

Net present value

SAR 633.1K

Return on investment

⁦43%⁩

Payback

6.4 years

YearCapexOpexBenefit
2027SAR 1.1MSAR 0SAR 0
2028SAR 1.5MSAR 0SAR 0
2029SAR 600KSAR 140KSAR 475K
2030SAR 0SAR 145KSAR 750K
2031SAR 0SAR 150KSAR 800K
2032SAR 0SAR 155KSAR 825K
2033SAR 0SAR 160KSAR 850K
2034SAR 0SAR 165KSAR 875K
2035SAR 0SAR 170KSAR 900K
2036SAR 0SAR 175KSAR 925K

6Initial risks

RiskLevelProposed response
Delay in backup grid-connection approvalHighA separate critical path for approvals
Funding not approved in the 2027 budgetHighSplit delivery across two fiscal years

Approval logChain: Proposal & feasibility approval · version ⁦4⁩

Every decision on the form — who, their role, the note and the time. It prints with the form.

#StepKindNameDecisionNoteDate & time
1Author—Eng. Mishari K. Al-OtaibiDirector, Sustainability & Social ResponsibilitySubmitted—⁦2026-06-18⁩ 13:28
2Line manager endorsementTechnical acceptanceEng. Reem K. Al-DosariThe requester’s line managerApproved—⁦2026-06-21⁩ 09:12
3PMO reviewMethodology reviewGhada A. Al-ShahraniPMO — analystApproved—⁦2026-06-23⁩ 10:19
4Portfolio manager reviewTechnical acceptanceApproval enginePortfolio managerPre-breach alert—⁦2026-09-03⁩ 08:00
5Portfolio manager reviewTechnical acceptanceApproval engineEscalated automatically to PMO — director (Dr. Noura M. Al-Otaibi) on ⁦2026-09-07⁩Automatic escalation—⁦2026-09-07⁩ 08:05

Signatures

Line manager endorsement

Eng. Reem K. Al-Dosari

Approved⁦2026-06-21⁩

PMO review

Ghada A. Al-Shahrani

Approved⁦2026-06-23⁩

Portfolio manager review

Eng. Mishari K. Al-Otaibi

Awaiting decision

Cost & funding review

Munirah A. Al-Khalidi

Later

Project Approval Committee

Dr. Noura M. Al-Otaibi

Later

Issued from Munjaz — Riyadh Chamber · ⁦2026-10-28⁩Form RC-PMO-F01 · version V1

Project proposal & feasibility study

Prints the form and its approval log on A4.

Approval path

Read from the approval engine: the steps, their holders and the time limits in working days.

Chain: Proposal & feasibility approval · version ⁦4⁩

Submitted by Eng. Mishari K. Al-Otaibi on ⁦2026-06-18⁩

  1. Technical acceptance

    Line manager endorsement

    Eng. Reem K. Al-Dosari · The requester’s line manager

    Approved · ⁦2026-06-21⁩ at ⁦09:12⁩

  2. Methodology review

    PMO review

    Ghada A. Al-Shahrani · PMO — analyst

    Approved · ⁦2026-06-23⁩ at ⁦10:19⁩

  3. Technical acceptance

    Portfolio manager review

    Eng. Mishari K. Al-Otaibi · Portfolio manager
    38 working days overdueAction time limit exceeded · Limit 3 working daysLimit 3 working days · Due ⁦2026-09-03⁩

    Pre-breach alert at ⁦75%⁩ — sent ⁦2026-09-03⁩

    Escalated automatically to PMO — director (Dr. Noura M. Al-Otaibi) on ⁦2026-09-07⁩

    Waiting on Eng. Mishari K. Al-Otaibi
  4. Financial approval

    Cost & funding review

    Munirah A. Al-Khalidi · Finance

    On the path because: Financial link?

    Delegated to Khalid N. Al-Mutairi

    Limit 4 working days · Expected by ⁦2026-09-09⁩

  5. Technical acceptance

    Project Approval Committee

    Dr. Noura M. Al-Otaibi · Project Approval Committee

    Limit 5 working days · Expected by ⁦2026-09-16⁩

Previous versions

Every version is kept with its status and what changed.

  1. V1In approvalCurrent⁦2026-06-18⁩

    First version of the proposal

    • Filled from the proposal wizard

    Eng. Mishari K. Al-Otaibi

Only one version so far.