Riyadh ChamberMunjaz11My actionsNotifications

What if? — Institutional Excellence & Capability Portfolio

The portfolio’s digital twin: try a budget cut, a change in people, cancelled projects and new project proposals, and read each decision’s impact before you take it.

Savings needed

SAR 0

Savings the engine found SAR 0

Expected value after the decision

SAR 4.3MSAR 4.3M

keeps ⁦100.0%⁩

Weighted risk

2020

High-risk: ⁦0⁩ → ⁦0⁩

People

2828FTE

Need ⁦28⁩ of ⁦28⁩ available

Move a control to see what the engine suggests.

The engine’s recommendation per project

Lowest merit first. Click a card to read the full reasoning.

Keep5Reduce scope0Merge0Defer0Stop0

Keep

Continues as planned

The portfolio’s digital twin

Bubble colour is the engine’s recommendation; size is the project’s remaining cost.

The portfolio’s digital twin
  • Keep
  • Reduce scope
  • Merge
  • Defer
  • Stop
Cost remaining · SAR 360K
The portfolio’s digital twin
CategoryRisk scoreStrategic valueCost remainingChart legend
Training Centre e-Learning Platform15.060.0SAR 360KKeep
Entrepreneurship Fast Track Platform33.057.0SAR 121KKeep
Institutional Performance Measurement & Power BI Dashboards20.066.0SAR 118KKeep
Operational Plans & Scorecards for the 2025–2030 Strategy18.086.0SAR 48KKeep

From remaining spend to spend after the decision

From remaining spend to spend after the decision
  • Total
  • Increase
  • Decrease
From remaining spend to spend after the decision
CategoryChangeRunning total
Remaining spend todaySAR 1.1MSAR 1.1M
After the decisionSAR 1.1MSAR 1.1M

Saved scenarios, compared

Pick up to three scenarios to compare side by side on budget, benefits, risks and resources.

  • A — 15% budget cut

    Ready-made

  • B — 10% cut with 10% fewer people

    Ready-made

  • Current scenario (not saved)

Scenario comparison

AA — 15% budget cutBB — 10% cut with 10% fewer people
Budget cut⁦15%⁩⁦10%⁩
People change0%−10%
Cancelled projects——
Added proposals——
Savings found300K416K
ShortfallTarget metTarget met
Value after the decision4.3M⁦100.0%⁩4.1M⁦97.2%⁩
Risk after the decision2022
People needed28 / 2822 / 25
RecommendationsKeep 5Keep 4Defer 1

Value kept vs savings

  • Value kept %
  • Savings of budget %
Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close