Working on:Riyadh Chamber of Commerce & Industry
Open NCRs
12⁦6⁩ critical or high

Of ⁦16⁩ raised in 2026

First-time pass
⁦36%⁩

⁦64%⁩ with remarks · of ⁦22⁩ inspections

Corrective actions overdue
1

Of ⁦4⁩ open actions

Average time to close
30 days

From raising an NCR to closing it

Cost of poor quality
SAR 351K

Rework, retests and delay — 2026

NCR lifecycle

Drag a report to its next stage. It cannot go to verification without a corrective action, nor close before its actions are done and verified.

Open3 · ⁦3⁩ cards

Found, not yet investigated

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Investigating4 · ⁦4⁩ cards

Root-cause analysis

⁦4⁩ of ⁦4⁩

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Corrective action3 · ⁦3⁩ cards

Corrective action under way

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Verifying2 · ⁦2⁩ cards

Checking the fix works

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Closed4 · ⁦4⁩ cards

Closed after verification

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Quality by project, and inspections

Acceptance criteria met in each project’s plan, inspection pass rate and open NCRs — and the inspection & review calendar.

Quality by project

Worst first · click the criteria to open the quality plan

ProjectCriteria metPass rateOpen NCRs

Inspections & reviews

Scheduled for the next two weeks, and the latest results

Upcoming
  • 302026-10

    Review of the handover file and documentation

    Document review · Correspondence & Document Management System

  • 022026-11

    Design review of the redesigned foundation axes

    Design review · The Chamber’s Investment Building — Business Tower on King Fahd Road

  • 042026-11

    Pre-launch penetration test

    Security test · My Business Portal 2.0 — the Unified Member Journey

  • 082026-11

    Re-test of tank 2 water-tightness

    Site inspection · Converting the Current Headquarters into a Member Services Centre & Committee Rooms

  • 112026-11

    MEP first fix — level 3

    Site inspection · Training & Employment Centre Complex

Latest results
  • 262026-10

    Basement retaining-wall inspection

    Site inspection · Chamber Branch & Manufacturers’ Service Centre — Second Industrial City

  • 242026-10

    Backfill compaction — zone 3

    Site inspection · The Chamber’s New Headquarters Building

  • 212026-10

    Waterproofing of the east roof

    Site inspection · Training & Employment Centre Complex

  • 192026-10

    Flash test of panel batch 6

    Material test · Solar Power for the Chamber’s Buildings & Branches

  • 192026-10

    Acceptance test of the wave-one services

    Acceptance test · My Business Portal 2.0 — the Unified Member Journey

    Passed
  • 152026-10

    Acceptance of fire alarm and suppression on floors 3 and 4

    Site inspection · Business Centre (Exit 6) Branch Rehabilitation

    Passed

Registers

Every NCR, inspection, plan, standard and corrective action — searchable, filterable, exportable.

Open
⁦12⁩ results
Export CSV
CriticalCorrective actionWorkmanshipEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@chamber.sa2026-09-18In 13 days2026-11-1030 Jumada I 1448 AHSAR 90K
HighInvestigatingMaterialsEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@chamber.sa2026-10-06In 8 days2026-11-0525 Jumada I 1448 AHSAR 32K
HighVerifyingWorkmanshipEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiSenior Project Manager — Buildings & FacilitiesP-022s.almalki@chamber.sa2026-08-27In 2 days2026-10-3019 Jumada I 1448 AHSAR 46K
HighInvestigatingDesignEng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector, Construction Projects & BuildingsP-020a.asiri@chamber.sa2026-09-12In 5 days2026-11-0222 Jumada I 1448 AHSAR 38K
HighVerifyingDataDana S. Al-SalehDana S. Al-SalehDirector, Enterprise Systems & IntegrationP-025d.alsaleh@chamber.sa2026-09-053 days overdue2026-10-2514 Jumada I 1448 AHSAR 9,000
HighOpenWorkmanshipEng. Fahad T. Al-SulamiEng. Fahad T. Al-SulamiSenior Project Manager — Branches & Service CentresP-023f.alsulami@chamber.sa2026-10-27In 27 days2026-11-2414 Jumada II 1448 AHSAR 21.5K
MediumOpenMaterialsEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiSenior Project Manager — Buildings & FacilitiesP-022s.almalki@chamber.sa2026-10-22In 22 days2026-11-199 Jumada II 1448 AHSAR 10.5K
MediumOpenWorkmanshipEng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector, Construction Projects & BuildingsP-020a.asiri@chamber.sa2026-10-25In 18 days2026-11-155 Jumada II 1448 AHSAR 14K
MediumCorrective actionDocumentationEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@chamber.sa2026-09-242 days overdue2026-10-2615 Jumada I 1448 AH—
MediumCorrective actionSoftwareEng. Sultan F. Al-GhamdiEng. Sultan F. Al-GhamdiProject Manager, My Business Portal 2.0P-005s.alghamdi@chamber.sa2026-10-01In 6 days2026-11-0323 Jumada I 1448 AHSAR 4,750
Total · 12SAR 268.8K
⁦1⁩–⁦10⁩ of ⁦12⁩

Activity

What changed in the quality records in this session.

Latest quality changes

No changes on this screen yet.

Leak in underground water tank 2 during the water-tightness test

NCR-2026-041

CriticalWorkmanshipOpen for ⁦40⁩ days
3

Step ⁦3⁩ of ⁦5⁩

Corrective action

What was found

The level dropped 0.6% in 24 h against a 0.1% limit; damp at two construction joints on the north wall.

Immediate containment

Test stopped, tank drained, the fire-fighting network kept off it until repaired.

Root cause

Water-stops were not fitted at two construction joints as per the approved drawings.

Corrective actions (⁦2⁩)

  • Inject the two joints with epoxy and fit external water-stops

    CA-2026-101 · Eng. Adel S. Al-Amoudi

    60
    In 5 days2026-11-0222 Jumada I 1448 AH
  • Add a water-stop hold point before every pour

    CA-2026-102 · Eng. Waleed O. Al-Juhani

    Done — awaiting verification
Owner
Eng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@chamber.sa
Raised by
Eng. Adel S. Al-AmoudiEng. Adel S. Al-AmoudiSenior Site Engineer (Contractor)P-043a.alamoudi@chamber.sa
Raised on
2026-09-187 Rabiʻ II 1448 AH
Due
In 13 days2026-11-1030 Jumada I 1448 AH
Vendor / contractor
United Buildings & Operations Co.
From inspection
INS-2026-061
Cost of poor quality
SAR 90K
Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close